Preventive Maintenance Schedule For Machine Shop |
||||||||||||||||||||
Preventive Maintenance Schedule For Machine ShopPreventive Maintenance Schedule For Machine Shop - Scheduling (1) system should be clear, precise and easy to operate, (2) should be based upon accurately determined time standards, (3) should be finalized in consultation with production department so that the equipments for maintenance purposes can be spared, (4) should aim at creating a balanced work load on each trade section in the department, that is, each section should be evenly loaded. Maintenance schedule should be flexible. Maintenance schedule should (1) be such that, the maintenance work can be carried out during lunch hours, between shifts or at week ends etc., (2) take advantage of planned machine stoppages such as tool changes, loading and unloading of job etc., (3) plan major repairs and overhauls during holidays, (4) make use of reserve plant if the need arises. Procedure The scheduling of maintenance work involves essentially two steps. 1. Preparation of master maintenance schedule. 2. Preparation of Detailed weekly or daily schedule.Master maintenance schedule indicates the nature and magnitude of each repair and construction task segment of maintenance for a specified time span. Considering total man hours needed for each task segment and the manpower available, the distribution of jobs (that will give reasonable man loadings, and can be accomplished) is done.A master schedule is flexible and a cushion always exists to accommodate, unanticipated tasks and jobs which are lagging behind schedule. Detailed schedules are prepared by breaking overall time spans allocated under master schedule. Detailed weekly work schedule provides information to each craft and shop regarding the task to be carried on each job for each day in the coming week.Detailed scheduling requires records of work capacity of each section of the maintenance department and of the maintenance department as a whole. Like master schedule, the detailed schedule should also be flexible and able to accommodate emergency jobs.Detailed schedule may be issued to concerned persons every day or near the week end. Maintenance schedule of each machine may be prepared and it will indicate the list of works which must be carried out (together with the frequency) and will contain servicing, adjustments, lubrication details and particulars of replacement work.
|
|
|||||||||||||||||||
|
|
||||||||||||||||||||